As outlined in the diagram enclosed, system operation
is very easy.
An intermittently driven conveyor belt, placed at right
angles to the tunnels, carries the trays by means of a
chain-drive. The trays are moved along a line that automatically
moves the product from the loading area to the entrance
to the first tunnel.
Trays are introduced into and extracted from each tunnel
by means of pneumatic pistons. This is the proofing tunnel,
where the dough leavening process takes place. Each tray
is moved down an internal line by means of an automated
wind-up device and remains inside the tunnel for a set
period of time, which varies depending on the dough’s
leavening requirements.
Once it comes to the end of the proofing tunnel, the tray
is automatically conveyed and introduced into the second
tunnel for the set pre-baking process. Trays are introduced
in the second tunnel one at a time, at intervals of about
60 sec.
Once it has reached the end of the pre-baking tunnel,
the product is normally very hot. For this reason, the
trays are automatically driven down a line of adequate
length and the product undergoes a programmed pre-cooling
process.
If the pre-baked product is a pizza base, a dressing process
may also be incorporated at this stage. Once they have
reached the end of the pre-cooling line, the trays are
automatically conveyed and introduced into the third tunnel,
where the pre-baked product is subjected to a programmed
freezing process.
The trays move along an internal line by means of an automated
wind-up device, and remain inside the tunnel for a set
period of time, which varies depending on frozen product
size.
At the end of the freezing line, the front belt moves
the trays in the third tunnel into unloading position.
The frozen product is unloaded from the trays and empty
trays are moved from the belt back into the loading area.
Functional
description of the system
This particular system is comprised of three different
tunnels working in sequence. The first tunnel is where
continuous proofing takes place. The second is for continuous
pre-baking, and the third is for continuous freezing.
The three tunnels are reciprocally and automatically interlinked
in order to convey, receive and treat the product in the
three phases mentioned above.
|